|
|
Projects Currently Not Assigned |
______________________________________________________________________________ New First Baptist Church Box 56 Mauriceville, TX 77626 Pastor: Kevin Brown Contact: Scott Moyer 409-745-3013 Crew Leader: Current Schedule: Se[t, 2009 Project Scope: New building is dried in with framing and some sheetrock complete. Work need is finishing the sheetrock. Would like to schedule Sept 7-18, 2009. ______________________________________________________________________________ NEW! First Baptist Church Normandy, TX Pastor: Kit Riley 936-396-2181; Contact: Don Harris 936-855-2689 Crew Leader: Current Schedule: May/June 2009 Project Scope: 90x110 metal building with partial 2-story over one end. Will have classrooms, offices, RR along each side with open space in center for meeting room and gym. Kitchen will be at one end with second floor above. Bldg will be dried in by end of April. Need is for interior wood framing and sheetrock with timing funding dependent. _____________________________________________________________________________ NEW! First Baptist Church Box 199 Urbana, MO 65767 Pastor: John Wisdom 417-993-0190: Contact: Larry Harbit 417-993-4934 Crew Leader: Current Schedule: May/June 2009 Project Scope: 60x70 wood bldg with full basement. Floor joists will be 6 metal I-beams with wood inter-joists. Roof pitch is 6/12. I-beams scheduled to be set May 1, 2009 ______________________________________________________________________________ Project is on Hold. Iglesia Bautista Santa Fe 14828 Hwy 6 Santa Fe, TX 77517 Contact: Joe Brantley 409-771-3476 Crew Leader: Current Schedule: July 2009 Project Scope: 80x80 metal building with stone and gunnite exterior. Work needed is interior wood framing and sheetrock. Will include platform, baptistery and drop ceilings. ______________________________________________________________________________ NEW! First Southern Baptist Church 4100 Mt. Elba Rd New Edinburg, AR 71660 Pastor: Dr. Joel Lisemby 870-348-5429 Crew Leader: Current Schedule: 2009? Project Scope: Small church just beginning planning for additional space. Trying to firm up funding. Could be an addition to an existing building or small new church building. ______________________________________________________________________________ Trinity Baptist Church 9119 Sienna Ranch Road Missouri City, TX 77459 Pastor: Eddie R. Alley 281-980-8822 Crew Leader: Current Schedule: 2009 Project has been delayed twice! Project Scope: Wood building that has been framed by TBM. Current work needed is sheetrock and drop ceiling. Electrical and plumbing is complete. 4-6-09 ______________________________________________________________________________ First Baptist Church 413 N Main Monticello, AR 71655 Pastor: Dr. David Mitchell 870-367-3449 Crew Leader: Current Schedule: Anytime Project Scope: 22,000 sqft 1-story building. Work needed is sheetrock. SS Classrooms, Fellowship Hall, and Recreation area. TBM have been working on this project. 4-6-09 ______________________________________________________________________________ Mt. Zion Baptist Church Box 153 Thorndale, TX 77564 Pastor: Larry Caldwell 512-424-4806Off; 512-698-4771Cell Crew Leader: Current Schedule: Mar 2009 Project Scope: 5500 sqft metal building with metal interior framing. Paperwork pending. _____________________________________________________________________________ First Baptist Church Box 339 Disney, OK 74430 Pastor: Kenneth Wood 918-435-4526 Cell Crew Leader: Current Schedule: Early 2009 Project Scope: 95 x 125 metal building with 50 x 75 addition. This project is essentially complete except for drop ceiling. The drop ceiling includes Nursery, Sanctuary, Library & RR. Sanctuary is vaulted with 30 ft ridge. They are considering installing a flat ceiling at lower level. If interested let me know and I will push the paperwork. Paperwork pending. ______________________________________________________________________________ Pine Forest Baptist Church 4800 N. Main Vidor, TX 77662 Pastor: Steve Dollar 409-786-1575 Crew Leader: Current Schedule: Tentative 2009 Project Scope: 4000 sqft office building. Still waiting on land availability. Paperwork pending. _____________________________________________________________________________ Midtown Baptist Church 1813 3rd Street Brownwood, TX 76801 Pastor: Joey Wilbourn 325-998-0832Cell Crew Leader: Current Schedule: Early 2008 Project Scope: Unknown at this time. ______________________________________________________________________________ 1st Phillipiane Baptist Church 8809 Bissonnet Houston, TX 77074 Pastor: Richard Delrosario 832-434-2526 Crew Leader: Current Schedule: Summer 2008 Project Scope: 12,500 sqft metal building. Sanctuary/classrooms, Fellowship Hall, FLC. Metal framing. In SW Houston. This project will have permits by end of January. Bids are out for slab and building. Looks like a May or June time frame. ______________________________________________________________________________ |
Project Information Updated as of April 9 2009 Unless otherwise noted. |