Projects Currently Not Assigned

______________________________________________________________________________

New
First Baptist Church Box 56 Mauriceville, TX 77626

Pastor: Kevin Brown Contact: Scott Moyer 409-745-3013

Crew Leader: Current Schedule: Se[t, 2009

Project Scope: New building is dried in with framing and some sheetrock complete. Work
need is finishing the sheetrock. Would like to schedule Sept 7-18, 2009.
______________________________________________________________________________
NEW!
First Baptist Church Normandy, TX
Pastor: Kit Riley 936-396-2181; Contact: Don Harris 936-855-2689
Crew Leader: Current Schedule: May/June 2009

Project Scope: 90x110 metal building with partial 2-story over one end. Will have classrooms,
offices, RR along each side with open space in center for meeting room and gym. Kitchen will
be at one end with second floor above. Bldg will be dried in by end of April. Need is for
interior wood framing and sheetrock with timing funding dependent.
_____________________________________________________________________________

NEW!
First Baptist Church Box 199 Urbana, MO 65767
Pastor: John Wisdom 417-993-0190: Contact: Larry Harbit 417-993-4934
Crew Leader: Current Schedule: May/June 2009

Project Scope: 60x70 wood bldg with full basement. Floor joists will be 6 metal I-beams with
wood inter-joists. Roof pitch is 6/12. I-beams scheduled to be set May 1, 2009
______________________________________________________________________________

Project is on Hold.
Iglesia Bautista Santa Fe 14828 Hwy 6 Santa Fe, TX 77517
Contact: Joe Brantley 409-771-3476
Crew Leader: Current Schedule: July 2009

Project Scope: 80x80 metal building with stone and gunnite exterior. Work needed is interior
wood framing and sheetrock. Will include platform, baptistery and drop ceilings.
______________________________________________________________________________

NEW!
First Southern Baptist Church 4100 Mt. Elba Rd New Edinburg, AR 71660
Pastor: Dr. Joel Lisemby 870-348-5429
Crew Leader: Current Schedule: 2009?

Project Scope: Small church just beginning planning for additional space. Trying to firm up
funding. Could be an addition to an existing building or small new church building.
______________________________________________________________________________

Trinity Baptist Church 9119 Sienna Ranch Road Missouri City, TX 77459
Pastor: Eddie R. Alley 281-980-8822
Crew Leader: Current Schedule: 2009
Project has been delayed twice!
Project Scope: Wood building that has been framed by TBM. Current work needed is
sheetrock and drop ceiling. Electrical and plumbing is complete. 4-6-09
______________________________________________________________________________

First Baptist Church 413 N Main Monticello, AR 71655
Pastor: Dr. David Mitchell 870-367-3449
Crew Leader: Current Schedule: Anytime

Project Scope: 22,000 sqft 1-story building. Work needed is sheetrock. SS Classrooms,
Fellowship Hall, and Recreation area. TBM have been working on this project. 4-6-09
______________________________________________________________________________

Mt. Zion Baptist Church Box 153 Thorndale, TX 77564
Pastor: Larry Caldwell 512-424-4806Off; 512-698-4771Cell
Crew Leader: Current Schedule: Mar 2009
Project Scope: 5500 sqft metal building with metal interior framing. Paperwork pending.
_____________________________________________________________________________

First Baptist Church Box 339 Disney, OK 74430
Pastor: Kenneth Wood 918-435-4526 Cell
Crew Leader: Current Schedule: Early 2009

Project Scope: 95 x 125 metal building with 50 x 75 addition. This project is essentially
complete except for drop ceiling. The drop ceiling includes Nursery, Sanctuary, Library & RR.
Sanctuary is vaulted with 30 ft ridge. They are considering installing a flat ceiling at lower
level. If interested let me know and I will push the paperwork. Paperwork pending.
______________________________________________________________________________
Pine Forest Baptist Church 4800 N. Main Vidor, TX 77662
Pastor: Steve Dollar 409-786-1575
Crew Leader: Current Schedule: Tentative 2009

Project Scope: 4000 sqft office building. Still waiting on land availability. Paperwork pending.
_____________________________________________________________________________

Midtown Baptist Church 1813 3rd Street Brownwood, TX 76801
Pastor: Joey Wilbourn 325-998-0832Cell
Crew Leader: Current Schedule: Early 2008
Project Scope: Unknown at this time.
______________________________________________________________________________

1st Phillipiane Baptist Church 8809 Bissonnet Houston, TX 77074
Pastor: Richard Delrosario 832-434-2526
Crew Leader: Current Schedule: Summer 2008

Project Scope: 12,500 sqft metal building. Sanctuary/classrooms, Fellowship Hall, FLC. Metal
framing. In SW Houston. This project will have permits by end of January. Bids are out for
slab and building. Looks like a May or June time frame.
______________________________________________________________________________




Project Information Updated as of April 9 2009
Unless otherwise noted.